JPSS Algorithm Updates in IDPS Block 2.3 Maintenance Release Mx13.00.1 Transition to Operations
6/17/25
-:--
-:--
ACOV
ESPC Operations Notice
---
The next Interface Data Processing Segment (IDPS) Block 2.3 maintenance release Mx13.00.1 is scheduled to transition to operations on June 17, 2025.
This update is to address the NOAA-21 CrIS SDR processing failure during the CrIS NEON Lamp Anomaly which occurred in March of 2025. It sets a new CrIS FS SDR Quality Flag 3 setting to indicate default laser wavelength used in spectral calibration. This update will apply to NOAA-21, NOAA-20, and S-NPP.
Please note: This release will not occur during a Critical Weather Day (CWD).